Tariff Structure
Water Tarrif Structure
| Customer Category | Approved/ Justified Tariff (Ksh/m3) |
|---|---|
| Residential Household | |
| 0-6 | Fixed Charge Ksh.330 |
| 7-20 | 65 |
| 21-50 | 80 |
| 51-100 | 100 |
| 100-300 | 120 |
| 300-> | 140 |
| Commercial/Industrial | |
| 0-6 | Fixed Charge Ksh.330 |
| 7-20 | 65 |
| 21-50 | 80 |
| 51-100 | 100 |
| 100-300 | 120 |
| 300-> | 140 |
| Government Institutions | |
| 0-6 | Fixed Charge Ksh.330 |
| 7-20 | 65 |
| 21-50 | 80 |
| 51-100 | 100 |
| 100-300 | 120 |
| 300-> | 140 |
| Schools and Colleges | |
| 0-600 | 70 |
| 601-1200 | 90 |
| 1200-> | 110 |
| Water Kiosks | |
| Per-M3 | Fixed Charge Ksh.35 |
| Resale at Water Kiosk | |
| Per-20 Litres | Fixed Charge Ksh.2 |
Sewer Tarrif Structure
No sewer
Meter Rents
Meter Rent per Month
| Size (inches) | Approved Charge (Ksh.) |
|---|---|
| 1 | 250 |
| 1 | 250 |
| 2 | 250 |
| 2 | 450 |
| 3 | 450 |
| 4 | 800 |
| 50 | |
| 50 | |
| 1 | 250 |
| 1 | 250 |
| 2 | 250 |
| 2 | 450 |
| 3 | 450 |
| 4 | 800 |
| .4 | 1500 |
| 50 | |
| 50 | |
| 1 | 250 |
| 1 | 250 |
| 2 | 250 |
| 2 | 450 |
| 3 | 450 |
| 4 | 800 |
| .4 | 1500 |
| 50 | |
| 50 | |
| 1 | 250 |
| 1 | 250 |
| 2 | 250 |
| 2 | 450 |
| 3 | 450 |
| 4 | 800 |
| .4 | 1500 |
| 50 | |
| 50 | |
| 1 | 250 |
| 1 | 250 |
| 2 | 250 |
| 2 | 450 |
| 3 | 450 |
| 4 | 800 |
| .4 | 1500 |
Water Deposits
Water Deposits
| Connection Type | Approved Charge (Ksh.) |
|---|---|
| Service | Approved(KSh.) |
| For special reading of a meter | 200 |
| For cutting off the supply at the request of the consumer | 200 |
| For turning on the supply otherwise than in respect of a first connection | 200 |
| For turning on the supply after disconnection for non-payment | 500 |
| Water bowser (own transport) per cu.m | 180 |
| Water bowser by WSP | 2500 |
| For testing a meter at the request of the consumer where it is found to register incorrectly to any degree exceeding 5% | The actual cost subject to a minimum charge of 500 |
| Exhauster services( company exhauster) | 5,000 for other customers and 4,000 for informal settlements |
| Private exhauster | 15,000 per Truck per month |
| (dumping into the companys sewer system) | |
| Domestic consumer (singular dwelling) | 1500 |
| Domestic consumer (singular connection serving more than one single dwelling including flats) consuming more than 200 cubic metres | 10000 |
| Water Kiosks Where Anticipated Monthly Consumption Is Less Than 50 cubic metres | 1000 |
| Between 50-100 cubic meters | 2000 |
| Between 100-150 cubic meters | 2500 |
| More than 150 cubic meters | 3000 |
| Retail shops, workshops and offices consuming more than 10 cubic metres | 3000 |
| Bar, restaurant and lodgings more than 15 cubic meters | 5000 |
| Hotel class a and b less than 150 cubic metres | 10000 |
| Hotel class c and d more than 150 cubic metres | 15000 |
| Hospitals more than 150 cubic metres | 20000 |
| Minor construction site (temporary connection) less than 200 cubic metres | 10000 |
| Large construction site (temporary connection) more than 200 cubic metres | 50000 |
| Light industries less than 200 cubic metres | 10000 |
| Medium industries 200-300 cubic metres | 15000 |
| Heavy industries more than 300 cubic metres | 20000 |
| Health centres/dispensaries less than 150 cubic metres | 5000 |
| Schools/colleges and other institutions more than 200 cubic metres | 10000 |
| Schools less than 200 cubic metres | 5000 |
| Topping up of consumer deposits after disconnection based on actual average consumption for domestic consumers | The actual cost subject to a minimum cost of 2,500 |
| Domestic consumer (singular dwelling) | 1500 |
| Domestic consumer (singular connection serving more than one single dwelling including flats) consuming more than 200 cubic metres | 10000 |
| Water Kiosks Where Anticipated Monthly Consumption Is Less Than 50 cubic metres | 1000 |
| Between 50-100 cubic meters | 2000 |
| Between 100-150 cubic meters | 2500 |
| More than 150 cubic meters | 3000 |
| Retail shops, workshops and offices consuming more than 10 cubic metres | 3000 |
| Bar, restaurant and lodgings more than 15 cubic meters | 5000 |
| Hotel class a and b less than 150 cubic metres | 10000 |
| Hotel class c and d more than 150 cubic metres | 15000 |
| Hospitals more than 150 cubic metres | 20000 |
| Minor construction site (temporary connection) less than 200 cubic metres | 10000 |
| Large construction site (temporary connection) more than 200 cubic metres | 50000 |
| Light industries less than 200 cubic metres | 10000 |
| Medium industries 200-300 cubic metres | 15000 |
| Heavy industries more than 300 cubic metres | 20000 |
| Health centres/dispensaries less than 150 cubic metres | 5000 |
| Schools/colleges and other institutions more than 200 cubic metres | 10000 |
| Schools less than 200 cubic metres | 5000 |
| Topping up of consumer deposits after disconnection based on actual average consumption for domestic consumers | The actual cost subject to a minimum cost of 2,500 |
| Domestic consumer (singular dwelling) | 1500 |
| Domestic consumer (singular connection serving more than one single dwelling including flats) consuming more than 200 cubic metres | 10000 |
| Water Kiosks Where Anticipated Monthly Consumption Is Less Than 50 cubic metres | 1000 |
| Between 50-100 cubic meters | 2000 |
| Between 100-150 cubic meters | 2500 |
| More than 150 cubic meters | 3000 |
| Retail shops, workshops and offices consuming more than 10 cubic metres | 3000 |
| Bar, restaurant and lodgings more than 15 cubic meters | 5000 |
| Hotel class a and b less than 150 cubic metres | 10000 |
| Hotel class c and d more than 150 cubic metres | 15000 |
| Hospitals more than 150 cubic metres | 20000 |
| Minor construction site (temporary connection) less than 200 cubic metres | 10000 |
| Large construction site (temporary connection) more than 200 cubic metres | 50000 |
| Light industries less than 200 cubic metres | 10000 |
| Medium industries 200-300 cubic metres | 15000 |
| Heavy industries more than 300 cubic metres | 20000 |
| Health centres/dispensaries less than 150 cubic metres | 5000 |
| Schools/colleges and other institutions more than 200 cubic metres | 10000 |
| Schools less than 200 cubic metres | 5000 |
| Topping up of consumer deposits after disconnection based on actual average consumption for domestic consumers | The actual cost subject to a minimum cost of 2,500 |
Other Charges
Other Charges
| Service Description | Approved Charge (Ksh.) |
|---|---|
| For special reading of a meter | 200 |
| For cutting off the supply at the request of the consumer | 200 |
| For turning on the supply otherwise than in respect of a first connection | 200 |
| For turning on the supply after disconnection for non-payment | 500 |
| Water bowser (own transport) per cu.m | 180 |
| Water bowser by WSP | 2500 |
| For testing a meter at the request of the consumer where it is found to register incorrectly to any degree exceeding 5% | The actual cost subject to a minimum charge of 500 |
| Exhauster services( company exhauster) | 5,000 for other customers and 4,000 for informal settlements |
| Private exhauster | 15,000 per Truck per month |
| (dumping into the companys sewer system) | |
| For special reading of a meter | 200 |
| For cutting off the supply at the request of the consumer | 200 |
| For turning on the supply otherwise than in respect of a first connection | 200 |
| For turning on the supply after disconnection for non-payment | 500 |
| Water bowser (own transport) per cu.m | 180 |
| Water bowser by WSP | 2500 |
| For testing a meter at the request of the consumer where it is found to register incorrectly to any degree exceeding 5% | The actual cost subject to a minimum charge of 500 |
| Exhauster services( company exhauster) | 5,000 for other customers and 4,000 for informal settlements |
| Private exhauster | 15,000 per Truck per month |
| (dumping into the companys sewer system) | |
| For special reading of a meter | 200 |
| For cutting off the supply at the request of the consumer | 200 |
| For turning on the supply otherwise than in respect of a first connection | 200 |
| For turning on the supply after disconnection for non-payment | 500 |
| Water bowser (own transport) per cu.m | 180 |
| Water bowser by WSP | 2500 |
| For testing a meter at the request of the consumer where it is found to register incorrectly to any degree exceeding 5% | The actual cost subject to a minimum charge of 500 |
| Exhauster services( company exhauster) | 5,000 for other customers and 4,000 for informal settlements |
| Private exhauster | 15,000 per Truck per month |
| (dumping into the companys sewer system) | |
| For special reading of a meter | 200 |
| For cutting off the supply at the request of the consumer | 200 |
| For turning on the supply otherwise than in respect of a first connection | 200 |
| For turning on the supply after disconnection for non-payment | 500 |
| Water bowser (own transport) per cu.m | 180 |
| Water bowser by WSP | 2500 |
| For testing a meter at the request of the consumer where it is found to register incorrectly to any degree exceeding 5% | The actual cost subject to a minimum charge of 500 |
| Exhauster services( company exhauster) | 5,000 for other customers and 4,000 for informal settlements |
| Private exhauster | 15,000 per Truck per month |
| (dumping into the companys sewer system) |
Penalties
Penalities
| Penalty Description | Approved Charge (Ksh.) |
|---|---|
| Self-reconnection after cut off for non-payment | 5,000 and billing to be backdated from date of cut off |
| Surcharge for illegal connection-domestic | 10,000 and regularise connection |
| Surcharge for illegal connection-commercial/school/college/hospital | 40,000 and regularise connection |
| Surcharge for illegal connection-construction site | 100,000 and regularise connection |
| Surcharge for illegal connection-industry | 500,000 and regularise connection |
| Illegal connection sewerage | Charges equal to those of illegal connection of water per category |
| Surcharge for tempering with meters (this to include meter removal, reversing of meter, etc.) | 5000 |
| Surcharge for direct suction of water from the supply line using a pump | 10000 |
| Surcharge for meter loss or damage | Cost of the meter |
| Self-reconnection after cut off for non-payment | 5,000 and billing to be backdated from date of cut off |
| Surcharge for illegal connection-domestic | 10,000 and regularise connection |
| Surcharge for illegal connection-commercial/school/college/hospital | 40,000 and regularise connection |
| Surcharge for illegal connection-construction site | 100,000 and regularise connection |
| Surcharge for illegal connection-industry | 500,000 and regularise connection |
| Illegal connection sewerage | Charges equal to those of illegal connection of water per category |
| Surcharge for tempering with meters (this to include meter removal, reversing of meter, etc.) | 5000 |
| Surcharge for direct suction of water from the supply line using a pump | 10000 |
| Surcharge for meter loss or damage | Cost of the meter |
| Self-reconnection after cut off for non-payment | 5,000 and billing to be backdated from date of cut off |
| Surcharge for illegal connection-domestic | 10,000 and regularise connection |
| Surcharge for illegal connection-commercial/school/college/hospital | 40,000 and regularise connection |
| Surcharge for illegal connection-construction site | 100,000 and regularise connection |
| Surcharge for illegal connection-industry | 500,000 and regularise connection |
| Illegal connection sewerage | Charges equal to those of illegal connection of water per category |
| Surcharge for tempering with meters (this to include meter removal, reversing of meter, etc.) | 5000 |
| Surcharge for direct suction of water from the supply line using a pump | 10000 |
| Surcharge for meter loss or damage | Cost of the meter |
| Self-reconnection after cut off for non-payment | 5,000 and billing to be backdated from date of cut off |
| Surcharge for illegal connection-domestic | 10,000 and regularise connection |
| Surcharge for illegal connection-commercial/school/college/hospital | 40,000 and regularise connection |
| Surcharge for illegal connection-construction site | 100,000 and regularise connection |
| Surcharge for illegal connection-industry | 500,000 and regularise connection |
| Illegal connection sewerage | Charges equal to those of illegal connection of water per category |
| Surcharge for tempering with meters (this to include meter removal, reversing of meter, etc.) | 5000 |
| Surcharge for direct suction of water from the supply line using a pump | 10000 |
| Surcharge for meter loss or damage | Cost of the meter |
More Tariffs...
About Us
Useful Links
Services Provided
Media & Publications
Follow us
Address
- 5th Floor NHIF Building Ngong Road
- P.O. BOX 41621-00100, Nairobi, Kenya